PERI's VARIO formwork system achieves high concrete finish to Derbyshire Resevoir Walls

项目实例

派利项目所在地的模板专家整合全球派利团队的经验和能力,帮助客户解决工程上的所有问题。

50 多以年来,我们始终致力于全球范围内各个建筑施工领域的工程i项目。派利项目所在地的模板专家拥有丰富的全球施工经验和身后专业知识,为您的项目提供工程解决方案,帮助您克服现场的任何问题,与您携手共同面对挑战。

如果您面临特殊的施工或工程挑战,我们愿意用我们的全系列产品、服务和经验迎接这些挑战并提供最佳的工程解决方案。

为客户提供最好的服务和工程解决方案是我们每天的动力。

所有项目

Covering the size of 24 football pitches, 17 m high and storage capacity for 13.2 million barrels of oil: at South Africa's Saldanha Bay, a huge crude oil storage facility with twelve 110 m x 110 m tanks was realised.
Triangular recesses were taken into consideration for the thin reinforced concrete slab. With different heights of up to 11 m, these feature up to 120 circular openings with a diameter of 20 cm respectively. These form a fine net which allows the natural sunlight through the subsequently integrated glass blocks in the interior of the tennis centre.
The new Puente Pumarejo in Latin American has a length of 2.3 km. The complex-shaped pylons rise up to a height of 80 m.
With the help of a crane, large-sized TRIO elements can be moved very quickly thus ensuring valuable time-savings. In one part of the airport building, walls up to 14 m high were realised.
Not only did the SKYDECK speed up forming operations, it also provided a particularly high level of safety on the construction site.
PERI UP nestles up to Ulm Minster - up to 71 m high - for the extensive renovation work. A 7 m high intermediate platform provides a possible storage location for the new stones.
A total of 14 different, perfectly coordinated PERI system solutions are in use at the construction site of the Calgary Cancer Centre, providing support to the construction workers on site.
The large-scale project, SKY PARK, is the new cultural epicentre of Bratislava – in addition to customised scaffolding solutions, PERI made use of the RCS rail climbing system in combination with VARIO GT 24 girder wall formwork during the erection of the residential complexes.
(Photo: Penta Real Estate)
The Al Bustan Street South construction project is one of four parts that make up the Sabah Al Ahmad Corridor infrastructure project and features bridges with a total length of more than 10 km.
At BASF's largest current investment project, an innovative scaffolding concept based on the PERI UP Flex scaffolding system has been saving both time and money - and has also set high standards regarding work safety.
Residential and office building “Ypsilon“, Ulm
Underground garage with assembled, hydraulic PERI UP lowering spindle for the prestressing and lowering of the slab
The framework-type tables were supported on MULTIPROP shoring towers.
For the M-8 road bridge, PERI engineers planned a project-specific shoring and formwork solution. The heavy-duty scaffold construction, consisting of VRB Heavy-Duty Truss Girders and VST Heavy-Duty Towers, safely transferred the high loads via long spans into the ground.
The concrete construction is PERI’s first housing project with DUO in the United Kingdom.
(Photo: seanpollock.com)
After months of planning and construction, Kuma’s vision is now a tangible work of art that is set to open its doors to the public.
The sustainable residential complex GIOIA 22 is situated at the heart of the Porta Nuova district of Milan and, upon completion, will cover 65 percent of its annual energy requirements using renewable energy sources. (Photo: Alberto Brevi)
The gas compressor platform CA-KU-A1 was erected at the shipyard of Dragados Offshore in Tamaulipas/Mexico with the aid of comprehensive PERI scaffolding solutions.
PERI has delivered around 480 tonnes of formwork and scaffolding material to the client’s construction site in addition to providing comprehensive on-site support.
Terfener Innbrücke, Terfens, Austria: The Terfener Innbrücke, which measures roughly 235 m in length, is situated on the A12 motorway in the Inntal valley in Tyrol. (Photo: Günther Bayerl)
For the construction of the three bridges WS 49, WS 52 and WS 54, PERI supplied an optimally coordinated formwork and scaffolding solution based on the VARIOKIT Incremental Launching Facility, VARIO GT 24 and TRIO Column Formwork and the PERI UP Scaffolding System.
85米高、485米长的菲尔斯塔铁路桥项目几乎包含了桥梁建设中所有可以想到的挑战: 巨大的桥墩在顶部分离成Y字形结构,修长的造型、精细的上部结构,德国铁路公司对清水混凝土结构的高要求; 施工期间对桥梁的静态力学模型进行调整,导致了更紧张的工期。
在慕尼黑Freimann新区,拜仁军营旧址处建造一座现代化教育基地,包括小学和高中的两座综合楼。
总面积约1.53万平方米的”桥梁结构“ 由70个10米高的V型支柱支撑。
The A26 project stands out on account of its five different tunnel cross-sections. In addition, the bends feature tight radii of 50 m to 750 m and the tunnel gradients vary, making it difficult to implement the new transport network.
The ACS Core 400 System is versatile and can be used with VARIO GT 24 Girder Wall Formwork and MAXIMO Panel Formwork systems.
On the first section through the mountainous region of western Northern Macedonia, the new motorway crosses a total of 14 viaducts. On a length of approx. 10 km, around 4,000,000 m³ of earth had to be excavated and a total of 150,000 t of concrete and 15,000 t of reinforcement were subsequently processed.
12+660号高架桥是正在建设的基切沃(Kičevo)至奥赫里德 (Ohrida)高速公路项目的一部分,地势条件十分险峻。
Construction of the housing complex Los Portones de Linares, Chile
Construction of the Barwa Commercial Avenue, Doha, Qatar
Aspen Residence, George Town, Penang, Malaysia
Aerial view of the jobsite “ Stadtquartier am Hirschgarten“ MK 4 “Friends“, Munich
A total of seven buildings form the new Maakri Quarter in the heart of Tallinn: a very striking multi-storey structure over 100 m high while surrounding historical buildings are being extensively renovated.
Banco de la Ciudad de Buenos Aires - A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.
Federal Chancellery Berlin - The challenging building form called for flexibly adaptable formwork and scaffolding systems.
DaimlerChrysler Subsidiary Warsaw, Poland - Not far from Warsaw‘s city centre, the new headquarters building of the automotive group together with a Mercedes-Benz dealership containing showrooms and a service centre has been realized.
Der neue Zollhof, Düsseldorf, Germany - The three spectacular buildings of the new Zollhof complex in Dusseldorf during different stages of construction.
Hotel Capella, Sentosa Island, Singapore - The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.
Hotel Marques de Riscal, Elciego, Spain - Designed by Frank O. Gehry, the building complex consists of several cuboids pushed into each other and an almost free-floating roof skin made of titanium.
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
Galileo Satellite Control Centre, Oberpfaffenhofen, Germany - The outside of the building resembles a medieval fortress. The facade is comprised of window openings as well as pre-determined regular tie points and horizontal pilaster strips.
Potsdamer Platz, Berlin, Germany - The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin.
South Health Campus, Calgary, Canada - The main building of the medical facility, situated south-west of Calgary, features two basement and eight upper levels each with around 20,000 m² of slab area.
By combining CB Climbing Units with the MAXIMO Panel Formwork, the required high quality of the concrete surfaces was achieved while, at the same time, maintaining the tight construction schedule.
As part of the extensive construction measures, a two-story passenger and ferry terminal has been realized on a total area of 25,000 m².
Over 500 complete floors were completed with the UNO Housing Formwork using a monolithic construction method.
The new corporate headquarters of Sasol have 10 upper floors and 7 basement floors.
Aerial view of the jobsite of the “villanova“ housing estate
Jeddah Gate “E3 – Abraj Al-Hilal 2“ during the shell construction
Three elevated high-rise structures for the new SPRM administrative centre. PERI supported the construction progress with an efficient climbing solution, complex shoring construction along with a comprehensive range of services.
Situated next to the famous Vienna Prater amusement park, seven distinctive and up to 33 m high residential towers are currently being realized.
Combined with a heating element, MAXIMO also offers the right solution for concreting at low temperatures. The heat supply provides an uninterrupted hydration process – as shown here in winter in Finland.
以自然材料?为主要材料的三万两千平方米的居住空间,使该建筑群成为贝尔格莱德最具吸引力的居住区之一。
ADAC Headquarters, Munich, Germany - For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
21st Century Tower, Dubai, United Arab Emirates - The RCS climbing protection panel complete encloses the upper floors under construction and provides protection against wind and weather - and increases productivity.
Barangaroo South, Sydney - The three ITS high-rise towers for the centre of the ambitious Barangaroo South project in the Sydney harbour area.
 Skyline of Tel Aviv with a view of the construction site for the Alon Towers
Construction of the 76 meters high office tower.
Dubai Frame, United Arab Emirates
Lo Storto, The Twisted One, the future administrative building of the Generali Insurance Group
Das zukünftig höchste Hochhaus Europas entsteht in Sankt Petersburg: Die Zentrale des Energiekonzerns Gazprom wird ganze 462 m hoch. Spektakuläre Multifunktionsgebäude, ein Amphitheater und großzügige Parks ergänzen den Komplex.
Demolition of the centrally located Syngenta high-rise building was hardly noticed in the immediate surroundings.
When finished, the 77-storey high-rise building will have a total height of 324.50 m.
During the summer months, the concrete shaft at the top of the tower and between the platforms and the bottom side of the lower platform were partly refurbished.
Absolute World, Missisauga, Canada - One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
Al Hamra Tower, Kuwait City, Kuwait - Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
Avala TV Tower, Belgrade, Serbia - The perfectly adapted shoring and working scaffold optimally supplemented the cost-effective formwork solution.
Cuatro Torres Business Area, Madrid, Spain - For the very wide range of requirements, PERI provided the most cost-effective solution with the ACS self-climbing formwork.
European Court of Justice, Luxembourg - The RCS climbing protection panel completely enclosed the slab edges of the upper floors under construction.
Evolution Tower, Moscow, Russia - Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
Hotel Mélia, La Défense, Paris, France - For the construction of the Hotel Meliá in the "La Défense" office district, PERI developed a comprehensive climbing formwork solution. This serves not only as an enclosure, which ensures the safety of the construction teams at all times, but also it supports the precast parapets during erection.
Il Bosco Verticale, Milan, Italy - Massive, 28 cm thick reinforced concrete balconies cantilever outwards for 3.35 m in an irregular fashion on all four sides of the building.
For constructing the 134 m high residential building, safety was a top priority. The PERI RCS P Climbing Protection Panel served as an enclosure as well as anti-fall protection. The gap-free enclosure of the skeleton structure´s floors protected the construction team also at great heights against strong winds and the weather.
ISET Tower, Yekaterinburg, Russia - The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
JKG Tower, Jalan Raja Laut, Kuala Lumpur - A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
Marina Bay Sands, Singapore - The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
Porta Nuova Garibaldi, Milan, Italy - Each of the two towers has three reinforced concrete cores which were constructed with help of two PERI ACS self-climbing variants.
Prosta Tower, Warsaw, Poland - The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
RONDO 1, Warsaw, Poland - The PERI CPP climbing protection panel reliably encloses the upper floors under construction.
Torre Agbar, Barcelona, Spain - The cylindrical core and facade walls of this 142 m high office building were constructed with PERI ACS self-climbing technology.
Las Torres de Hércules, Los Barrios, Spain - Over the entire height, oversized letters into the concrete facade symbolize the inscription "Non plus ultra".
Trump International Hotel & Tower, Chicago, USA - With a height of 415 m, the Trump International Hotel and Tower on the Chicago River is a very impressive skyscraper.
Trump World Tower III, New York, USA - With a height of 258 m and its luxurious furnishings, the Trump World Tower completely re-defined the New York skyline.
Turning Torso, Malmö, Sweden - The Turning Torso structure turns at an angle of 90° as it climbs upwards over nine cubes – each cube consists of five floors.
Warsaw Spire - With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.
The upper floors of the “BraWoPark Business Centers II“ in Braunschweig, where the PERI RCS climbing protection panel is used for advertising purposes on the two topmost floors.
The Al Habtoor City Towers are three high-rise buildings which are growing up to a height of 300 meters at the same time.
The design of modern architecture confronts construction with very sophisticated demands.
Henninger Turm, Frankfurt am Main
Auditorio de Tenerife, Tenerife, Spain - The Auditorio de Tenerife is used as a concert hall and is an example of the almost unlimited possibilities provided by concrete construction. The formwork technology required for such a structure presented a special challenge which our engineers solved in a rational and safe manner.
Hradec Králové Library, Czech Republic - With an X-shaped floor plan, the architectural concept of this building created a new highlight in the urban development of the city of Hradec Králové. Originally, all external surfaces should have received an orange-painted facade. This concept was completely rejected due to the high-quality concrete surface finish.
Casa da Música, Porto, Portugal - Built to coincide with “Porto 2001 – European Culture Capital”, the concert hall is pictured here after structural work had been completed.
Centre Pompidou, Metz, France - The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.
Edificio Ágora, Valencia, Spain - A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
Catholic Church Centre, Cologne-Blumenberg, Germany - 6 m long units with frames comprised of U 120 steel walers were positioned in pairs after the supporting scaffold, consisting of ST 100 stacking towers, had been adjusted.
MAXXI - Museo nazionale delle arti del XXI secolo, Rome, Italy - This extraordinary structure is characterized by twisting reinforced concrete walls which reach heights of up to 14 m.
Langen Foundation, Neuss-Hombroich, Germany - The glass veranda area is used to exhibit Japanese works of art from the last millennium.
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
Mercedes-Benz Museum, Stuttgart, Germany - The execution of this very impressive project required unique engineering and assembly implementation on the construction site.
Musée Würth, Erstein, France - With the flexible VARIO GT 24 wall formwork system, the requirements regarding the formlining joint arrangement as well as the requested execution and positioning of the tie points could easily be fulfilled.
Museum of Tomorrow, Rio de Janeiro - For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
National stadium Kazimierz Górski, Warsaw, Poland - The complex construction project with highest quality requirements demanded an experienced construction site team as well as on-site support through PERI engineers.
Parco della Musica e della Cultura, Florence, Italy - The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
St. Canisius Church, Berlin, Germany - The modern reinforced concrete design is characterized by exactly defined requirements placed on the visible concrete surfaces.
Restaurante Florante Submarino, Valencia, Spain - With 77 t of PERI UP Rosett materials, the building´s design could be accurately realized as a three-dimensional spatial load-bearing structure.
Sports arena Lora, Split, Croatia - The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.
Heavy athletics stadium, Athens, Greece - HD 200 heavy-duty props combined with the MULTIPROP system formed a 21.00 m high shoring tower for load transfers of 500 kN.
St. Martins Therme & Lodge, Frauenkirchen, Austria - With formwork and scaffolding systems perfectly matched each structural component, the concrete frame could be completely finished in only 9 months.
Temple of Divine Providence, Warsaw, Poland - With the help of the PERI UP Rosett modular scaffold system, 24-metre high shoring was erected at the main entrance of the temple. Even at large heights, up to 40 kN per leg could be safely and reliably transferred.
UTEC University Campus, Lima, Peru - With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
Lascaux IV - Centre International d’Art Pariétal (CIAP): Overall view of the museum complex. Through the TRIO panel formwork, the high requirements on the concrete surfaces have been fully met.
Overview of the construction site - PERI Project - "Humboldt Forum" City Palace, Berlin
Earthquake-proof shoring solution for the Stavros Niarchos Foundation Cultural Center building in Athens. Designed by the Architect Renzo Piano.
Aquatics Centre, London
Neuschwanstein Castle is one of Germany's most famous sights. Every year around 1.5 million tourists from all over the world visit the cultural monument near Füssen.
Bosjes Chapel (Photo: Steyn Studio)
On two artificial islands at both exits of the HZMB tunnel, striking architectural concrete structures are currently being built. On the right of the picture, the exit at the west end of the tunnel can be seen. (Graphic: © China Communications Construction Company Ltd. CCCC)
VitraHaus, Weil am Rhein, Germany - For the VitraHaus, twelve reinforced concrete bodies with massive gable roofs were stacked up to form a 20 m high building complex.
The new headquarters of the environmental company Bee'ah is currently being realized according to the plans of the famous architect Zaha Hadid. The design of the futuristic building with its complex structure is based on the shape of a sand dune. (Source: www.zaha-hadid.com)
For the fabrication of the massive reinforced concrete slab below the pitch, the PERI engineers support the MULTIFLEX girder slab formwork solution with almost 8-meter high PERI UP shoring towers.
The Italian Expo pavilion has a very sophisticated architectural design and had to be built within an extremely tight time frame.
Suspended PERI UP Working Platforms ensured the safe installation of a spectacular stadium roof in Singapore.
Bridge over the Dunajec, Tarnow, Poland - With some supplementary system components, the VARIOKIT engineering construction kit can also be used for the balanced cantilever construction method.
Motorway Bridge D1, Považská Bystrica, Slovakia - The constantly-changing cross-section of the superstructure placed great demands on the VARIOKIT system equipment.
德拉瓦高速公路桥 - VARIOKIT 边梁模板车用于浇筑该桥面的外边梁,水平方向荷载由摩擦力完全抵消,不需要锚固
Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.
Formwork solution with system components of VARIOKIT Engineering Construction Kit
West tunnel of the former Elbe tunnel, which pedestrians continued to use, while the other tunnel was being repaired.
PERI brace frame structure to transfer the loads during single-sided concreting with ties of the DW 26 system, at the jobsite for the Audi tunnel in Ingolstadt.
Msheireb Metro Station, Doha
Infrastructure buildings, Pilbara region, Australia
Assembly of prefabricated elements
VARIOKIT heavy-duty shoring towers and truss girders are used as load-bearing shoring for the boundary segments of a 412-m long motorway bridge.
Designed by Zaha Hadid, the new station – a construction consisting of concrete, glass and steel in the form of a bridge – is characterized by numerous curved shapes. Traffic flows from travelers inspired the architect to create this extraordinary shape.
VARIOKIT tunnel formwork carriage used during the construction of the U4 subway tunnel in Hamburg
The slab formwork carriages used are very modular in their design; the great flexibility of the VARIOKIT standard components facilitate simple adjustments to suit project-specific conditions. The relatively low weight of the VARIOKIT solutions is an additional benefit of the Engineering Construction Kit.
The refurbished Williams Bridge is an important road link between the northern and southern districts of Rotterdam. Its unrestricted and safe use was also to be ensured during the scaffolding operations and renovation work.
Viaduct Krakow-Płaszow Railway Junction - Customized solution through the flexible and modular adaptability of the system.
Oparno Motorway Bridge, Czech Republic - The 258 m long and 50 m high arched bridge crosses the Opamo Valley in the Bohemian Forest.
Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.
Trmice Motorway Bridge, Aussig, Czech Republic - For the 1,083 m long Trmice motorway bridge near Aussig in the Czech Republic, 59 piers were cost-effectively formed using PERI formwork.
Térénez Bridge, Crozon, France - Using a combination of ACS self climbing technology and VARIO GT 24 girder wall formwork, a crane-independent and safe solution was developed.
Tošanovice-Žukov Bridge, Ostrava, Czech Republic - The VARIOKIT steel composite carriage consisted of three main components: the formwork units, cross frames and the two longitudinal trusses.
Chachenka Motorway Bridge, Moscow, Russia - The 22.25 m wide superstructure sections were constructed with section lengths ranging from 3.40 m to 4.10 m in regular 10-day cycles.
The expert engineers of PERI Israel ideally matched the superstructure formwork and the shoring for the crossing of a highway over a railroad line.
The PERI bridge formwork concept was based on rentable modular construction systems with standardized components.
A tunnel formwork system solution based on VARIOKIT makes the Tauern motorway disappear in an enclosure structure within a short construction time for a length of 1,545 meters.
The fabrication of the high side and center walls as well as the breakwaters for two transitional structures is carried out with mobile PERI portal formwork carriages – with a fast cycle sequence and in highest quality.
英国默西河盖特威大桥,连接朗科恩与威德尼斯
Citytunnel Malmö, Sweden - The southern entrance area was constructed using the cut-and-cover method for a length of around 1.5 km.
The 3rd Bosphorus Bridge has the highest concrete bridge piers in the world, and will eventually connect the European and Asian continents after its completion in 2015.
BBI Airport, Berlin Brandenburg, Germany - Only when seen from an aerial perspective is the scale of the construction site really apparent: the area is the size of around 2,000 football pitches.
Toulouse-Blagnac Airport, France - The semi-circular positioned reinforced concrete columns were concreted in one pour over the entire height of 11.75 m.
Golden Ears Bridge, Vancouver, Canada - The almost one kilometre long cable-stayed bridge over the Fraser River is the core element of the 13 kilometre long highway project.
Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.
Lekki Ikoyi Bridge, Lagos, Nigeria - The Lekki Ikoyi Bridge in Lagos is the first cable-stay bridge in Nigeria.
Lötschberg Tunnel, Mitholz, Switzerland - Tunnel formwork carriage for a cross-section width of 15.74 m and 12.54 m high. At first, the tunnel side walls were shuttered and concreted.
Marchlehner Gallery, Sölden, Austria - The VARIOKIT tunnel formwork solution accelerated construction of the 228 m long Marchlehner gallery situated at a height of 1,800 m above sea level. The competent planning process took into account al possible project requirements which ensured on-schedule completion before the onset of winter.
Mega Bridge, Industrial Ring Road, Bangkok, Thailand - The four pylons of spectacular Mega Bridge in Bangkok rise 173 m into the sky. For the realization, the ACS climbing system ensured rapid construction process.
Midfield Terminal Building, Abu Dhabi - The Midfield Terminal Complex is the ultimate in construction sites.
Metro extension, Algiers - The Algerian metro station "Place des Martyrs" is 144 m long and features record-breaking dimensions with its 23 m width and 14.80 m height.
Hongkong-Zhuhai-Macao Bridge (HZMB), China - The 180 m long tunnel elements are cast in eight individual segments each 22.50 m long – monolithic, without ties and in compliance with strict dimensional tolerances.
Mur Bridge Frohnleiten - For the construction of the Mur Bridge near Frohnleiten, the new VARIOKIT heavy-duty truss from PERI has set new standards in shoring operations.
Øresund Link, Denmark–Sweden - One of the two production lines with the formwork assemblies reaching a total weight of 1,150 t. Here the internal formwork has been retracted into the reinforcement cage.
Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
The Squaire, Frankfurt am Main, Germany - PERI UP scaffolding on the longitudinal sides of the building was designed according to the expected loads and carried the construction loads.
Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.
Traffic junction Siekierkowska roadway, Warsaw, Poland - For the superstructure formwork as well as the shoring construction consisting of the MULTIPROP system and ST 100 stacking towers, only system components were used.
Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.
Tunnel bypass Flüelen, Switzerland - The special support und moving construction comprised of elements from the PERI tunnel waler system which adapted exactly to each cross-section. The complete formwork unit could be moved on rails from section to section using pulling equipment supplied by the contractors. Due to economic reasons, setting and stripping were done mechanically.
Tunnel Jumeirah Palm Island, Dubai, United Arab Emirates - In 25 m long concreting steps and four cycle sequences, the tunnel bottom plate, two wall sections respectively and then the slab could be concreted one after the other.
Tunnel Limerick, Ireland - Tunnel formwork carriage on the basis of the VARIOKIT civil engineering construction kit for the six additional concreting sections at the southern portal carried out parallel to the construction of the main tunnel elements.
Nordhavnsvej Tunnel - The formwork carriage has been designed so that trucks can pass through at any time without obstacles. Due to the cramped site conditions, an absolutely essential requirement for the execution.
Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.
Viaduc de Millau, France - In the area of the double piers, 14 complete ACS self-climbing units with telescopic working platforms were used.
Waldschlösschenbrücke, Dresden, Germany - Two steel arches, each with a span of 148 m, carry the middle section of the Waldschloesschen Bridge 26 m above the Elbe.
Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
两座新建全长166米的立交桥是造Novog Sada 至 Kelebije高速铁路线升级改造项目中的一部分。
贝尔格莱德环城高速公路是该地区最重要的交通路段之一,随着5 号(3.1 公里)、6 号
路段(9.6 公里)施工的完成,贝尔格莱德半环城高速公路项目也即将竣工,这将显著缓解首都
拥堵的交通路况。
使用VARIOKIT-VST高强塔架搭建8米高的塔架支撑,在塔架之间使用VARIOKIT-VRB桁架梁组装跨度28米的桁架结构。
Czajka Sewage Plant, Warsaw, Poland - In a construction time of only two years, a total of 120 individual structures were built on an area equivalent to 80 football pitches.
PERI project - water retaining structures - Foz Tua Dam, Vila Real – Alijó, Portugal
Formwork, scaffolding, engineering: PERI supported site operations with a project-specific formwork and scaffolding concept.
Sandelermöns Waterworks, Jever, Germany, PERI project
Canal bridge over the river Elbe, waterway junction Magdeburg, Germany - The 17 monumental piers of the foreland bridge are characterised by positioned tie points, dummy joints, clearly defined recesses and geometry resembling the shape of a ship´s bow. The contractor also used VARIO GT 24 wall formwork here and achieved excellent concrete surfaces.
Sewage plant As Samra, Jordan - With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.
Nile river barrage Naga Hammadi, Egypt - The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.
Lock facilities, Panama Canal, Panama - More than 12 months after starting the development work on the Panama Canal, the dimensions and the massive structural elements are clearly visible.
Gravity dam Barrage Koudiat Acerdoune, Algeria - The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.
The climbing formwork solution, which is based on system construction elements and 3D-formwork units, is individually adapted by the PERI experts to the building geometry and the single-sided load transfer.
The fabrication of the subterranean machine cavern as well as the two intake structures require a sophisticated formwork plan as well as expert jobsite support.
PERI Belarus works out a comprehensive formwork and shoring concept for every construction status.
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.
LGS Weather Protection Roof from PERI, the lattice girder system for weather protection, rain protection, snow protection, hail protection.
The first of a total of three sections will become operational in the autumn of 2017.
Los Ramones II Pipeline, San Luis Potosi, Mexico
The weather protection roof based on the PERI UP Flex LGS Lattice Girder System provided reliable protection against the effects of the weather. The roof segments could be pre-assembled on the ground and subsequently lifted into their final position using a mobile crane.
Albian Sands, Fort McMurray, Canada - Through the planning and supply of formwork and scaffolding from one source, the MULTIFLEX slab formwork and PERI UP shoring could be perfectly matched.
Refuse Derived Heating and Power Station, Spremberg, Germany - The VARIOKIT heavy-duty shoring towers with a height of 23.60 m can support loads of over 200 t in each case. The horizontal assembly of the approx. 10 m high tower sections makes the erection of the shoring easy and safe.
Grain Silo near Parma, Italy - Cost-effective PERI climbing concept: with a complete platform level and halved on-site wall formwork requirements, fast and continuous working operations were achieved.
Power plant Belchatow, Poland - The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
Exhibition centre Bilbao, Spain - For the construction of the Bilbao Exhibition Centre, PERI engineers developed a practical movable falsework and formwork solution.
Palm paper mill, King’s Lynn, Great Britain - Only 7 months after beginning the excavation and foundation work, the topping-out ceremony took place; 8 months later, production started in August 2009.
Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.
Cement plant Ivano-Frankowsk, Ukraine - For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution.
Jobsite with scaffolds and crane at the building of the dedusting system of blast furnace 9 of ThyssenKrupp Steel Europe in Duisburg
The PERI shoring concept for the transfer of high loads was based on standardized construction kit systems: MULTIPROP, HD 200 and VARIOKIT. The required access technology is generated with the PERI UP modular scaffolding system.
CACAK-TRBUSANI-隧道全长278米,是新建的E763高速公路上连接Prejina与Pakovraće12公里公路段中最具挑战的建筑结构。工程完工后,现有高速公路段出口处的拥堵现象将显著减少,在很大程度上缓解Čačak地区的交通压力。
Bridge renovation Ponte Rio Tua, Vila Real, Portugal - For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.
Unusual Scaffolding solution: Cantilevered instead of positioning. New engineered working scaffold solution.
The refurbishment of the 185-m long Inntal Bridge is carried out with two PERI construction kit systems which complement each other – mostly without any negative impacts on road traffic.
Up to 70,000 visitors flock daily to Australia's largest shopping centre which is now completely covered by a gigantic glass roof – the result of an expansion project. Work was carried out while the centre remained opened for daily business; the schedule for the entire construction project was extremely short. (Photo: David McArthur Parallax Photography)
Marie-Elisabeth-Lüders-Haus, Berlin
The PERI UP scaffold level at a height of 5 m reliably separates the production line of the bottling plant from the construction work on the roof structure.
Cristo Rei Monument, Lisbon, Portugal - Work could be safely carried out on the spacious and geometrically adapted working platforms of the PERI UP Rosett scaffold which was erected up to the head of the statue.
Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
Karlskirche Church Vienna, Austria - The cantilevered working platform as seen from the visitors platform.
Maritime museum Tallinn, Estonia - A total of 8,500 m² of exhibition space is now available under the three domes.
Museum of military history, Dresden, Germany - The almost 100 m long Libeskind-designed structure features a 30-metre high wedge tip made of glass and steel.
Puente de La Pepa, Bahia de Cádiz, Spain - Almost half of the 3.2 km long bridge construction crosses the Bay of Cadiz, with a 540 m span and 69 m vertical clearance between the two pylons.
Motorway bridge over the Rio Sordo, Vila Real, Portugal - The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.

Interested in how PERI can support your next project?

高效、经济、安全

联系我们