Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.

Zehun生态桥
捷克共和国, Zehun

  • 绿植拱桥宽36米、高10米、长75米,建造在D11高速公路上方

 

 

 

项目类别
交通项目
客户介绍
客户: PSVS,布拉格

项目实现

工地快照、项目记录

客户需求与派利工程解决方案

Milan Jerábek, Construction Manager
Milan Jerábek, Construction Manager
Milan Jerábek
施工经理
因为工期很紧,我们必须准备全部的模板材料。派利公司使用GRV铰接式曲面模板系统、PERI UP盘扣式脚手架系统以及MULTIPROP系统,制订了完整的施工方案。感谢派利公司的技术指导,帮助我们在最短的时间内完成支架的搭建。选择派利公司作为合作伙伴是一个绝对正确的决定。

相关产品系统

模板、脚手架、工程技术服务

高效、经济、安全