在巴塞尔市中心进行Syngenta-大厦的拆除,施工过程非常安静,几乎不被人察觉

拆除Syngenta-大厦
瑞士, 巴塞尔

拆除巴塞尔中心54米高的Syngente大厦总部,该总部直接在公司园区的边缘位置,毗邻黑森林大街和Badischen 火车站。

 

 

地点
项目类别
高层建筑与大厦
客户介绍
客户: ERNE AG 建筑公司,劳芬堡

项目实现

工地快照、项目记录

客户需求与派利工程解决方案

I am very impressed with the PERI solution. At first, I was sceptical regarding safety and the progress of the demolition work in the high-rise building. Through the protection provided by the RCS Climbing Protection Panel, however, interesting and relaxed working conditions without risk is possible. In addition, we could climb much more efficiently than originally planned. As a result of this, and through the possibility of simultaneous execution of the demolition and disposal work, we could achieve a reduction in the planned schedule for the demolition work.
I am very impressed with the PERI solution. At first, I was sceptical regarding safety and the progress of the demolition work in the high-rise building. Through the protection provided by the RCS Climbing Protection Panel, however, interesting and relaxed working conditions without risk is possible. In addition, we could climb much more efficiently than originally planned. As a result of this, and through the possibility of simultaneous execution of the demolition and disposal work, we could achieve a reduction in the planned schedule for the demolition work.
Manfred Nussbaum
施工员
派利公司的解决方案给我留下了深刻的印象,最开始,我们对拆除这一高层建筑的施工过程和施工安全性抱有怀疑的态度,但在RCS可爬升防护屏的保护下,我们能够轻松、愉快的完成施工,避免任何风险,同时施工效率也比原计划提高很多。因此我们可以同时进行多处的拆除施工,缩短了施工时间。

相关产品系统

模板、脚手架、工程技术服务

高效、经济、安全