PERI's VARIO formwork system achieves high concrete finish to Derbyshire Resevoir Walls

项目实例

派利项目所在地的模板专家整合全球派利团队的经验和能力,帮助客户解决工程上的所有问题。

50 多以年来,我们始终致力于全球范围内各个建筑施工领域的工程i项目。派利项目所在地的模板专家拥有丰富的全球施工经验和身后专业知识,为您的项目提供工程解决方案,帮助您克服现场的任何问题,与您携手共同面对挑战。

如果您面临特殊的施工或工程挑战,我们愿意用我们的全系列产品、服务和经验迎接这些挑战并提供最佳的工程解决方案。

为客户提供最好的服务和工程解决方案是我们每天的动力。

所有项目

最佳的工程解决方案,满足您所有需求。

显示过滤条件
Covering the size of 24 football pitches, 17 m high and storage capacity for 13.2 million barrels of oil: at South Africa's Saldanha Bay, a huge crude oil storage facility with twelve 110 m x 110 m tanks was realised.
West Coast Peninsula, 南非 OTMS 油罐群 为油罐群提供非常规的工程方案
Triangular recesses were taken into consideration for the thin reinforced concrete slab. With different heights of up to 11 m, these feature up to 120 circular openings with a diameter of 20 cm respectively. These form a fine net which allows the natural sunlight through the subsequently integrated glass blocks in the interior of the tennis centre.
Al-Shadadiya, 科威特 室内网球中心 独特的建筑造型,结合了现代与传统元素
The new Puente Pumarejo in Latin American has a length of 2.3 km. The complex-shaped pylons rise up to a height of 80 m.
哥伦比亚, 巴兰基亚/大西洋 哥伦比亚,巴兰基亚/大西洋,新Pumarejo大桥 使用派利施工系统完成这一创纪录桥梁的施工
With the help of a crane, large-sized TRIO elements can be moved very quickly thus ensuring valuable time-savings. In one part of the airport building, walls up to 14 m high were realised.
伊斯坦布尔, 土耳其 伊斯坦布尔机场 使用派利系统完成伊斯坦布尔新机场的施工
Not only did the SKYDECK speed up forming operations, it also provided a particularly high level of safety on the construction site.
哥本哈根, 丹麦 辉凌制药A/S研发中心 派利公司提供为项目定制的施工方案,满足复杂的建筑设计要求
PERI UP nestles up to Ulm Minster - up to 71 m high - for the extensive renovation work. A 7 m high intermediate platform provides a possible storage location for the new stones.
乌尔姆, 德国 明斯特大教堂 三个施工现场 – 一个教堂: 在乌尔姆明斯特大教堂完成修复作业
A total of 14 different, perfectly coordinated PERI system solutions are in use at the construction site of the Calgary Cancer Centre, providing support to the construction workers on site.
卡尔加里, 加拿大 癌症治疗中心 派利为卡尔加里癌症治疗中心的施工提供了多种系统解决方案
The large-scale project, SKY PARK, is the new cultural epicentre of Bratislava – in addition to customised scaffolding solutions, PERI made use of the RCS rail climbing system in combination with VARIO GT 24 girder wall formwork during the erection of the residential complexes.
(Photo: Penta Real Estate)
布拉迪斯拉发, 斯洛伐克 SKY PARK 公寓 为布拉迪斯拉发市新文化中心的三座公寓大厦提供脚手架方案
The Al Bustan Street South construction project is one of four parts that make up the Sabah Al Ahmad Corridor infrastructure project and features bridges with a total length of more than 10 km.
多哈, 卡塔尔 Al Bustan 南大街高速公路桥 为多哈市具有挑战性项目提供施工方案
At BASF's largest current investment project, an innovative scaffolding concept based on the PERI UP Flex scaffolding system has been saving both time and money - and has also set high standards regarding work safety.
路德维希港, 德国 巴斯夫路德维希港,新建乙炔工厂 使用创新的BIM方法为工业设施工程设计脚手架方案
Residential and office building “Ypsilon“, Ulm
乌尔姆, 德国 住宅和商业建筑“Ypsilon ” PERI UP Easy脚手架系统确保了零工伤施工
Underground garage with assembled, hydraulic PERI UP lowering spindle for the prestressing and lowering of the slab
阿伦, 德国 翻新阿伦住宅小区地下停车场 翻新公寓大厦的地下停车场
The framework-type tables were supported on MULTIPROP shoring towers.
瑞士, Risch-Rotkreuz 瑞士,里施-洛特克鲁斯,阿格拉亚-花园大厦 使用VARIOKIT系统为绿色公寓大厦提供施工方案
For the M-8 road bridge, PERI engineers planned a project-specific shoring and formwork solution. The heavy-duty scaffold construction, consisting of VRB Heavy-Duty Truss Girders and VST Heavy-Duty Towers, safely transferred the high loads via long spans into the ground.
Neustettin, 波兰 波兰,Neustettin 环城路,M-8高速公路桥 为波兰首次提供VARIOKIT桁架系统
The concrete construction is PERI’s first housing project with DUO in the United Kingdom.
(Photo: seanpollock.com)
苏塞克斯, 英国 混凝土别墅 完全使用DUO系统,浇筑出色的清水混凝土结构
After months of planning and construction, Kuma’s vision is now a tangible work of art that is set to open its doors to the public.
邓迪, 英国 维多利亚&阿尔伯特博物馆 为巧夺天工的博物馆提供特别的模板方案
The sustainable residential complex GIOIA 22 is situated at the heart of the Porta Nuova district of Milan and, upon completion, will cover 65 percent of its annual energy requirements using renewable energy sources. (Photo: Alberto Brevi)
米兰, 意大利 GIOIA 22 创新与节能:派利为米兰市的GIOIA 22 办公综合建筑提供施工方案
The gas compressor platform CA-KU-A1 was erected at the shipyard of Dragados Offshore in Tamaulipas/Mexico with the aid of comprehensive PERI scaffolding solutions.
阿尔塔米拉港, 墨西哥 CA-KU-A1天然气压缩机平台(海上采油平台) 为墨西哥Ku-Maloob-Zaap石油、天然气油田搭建新的海上采油平台
PERI has delivered around 480 tonnes of formwork and scaffolding material to the client’s construction site in addition to providing comprehensive on-site support.
孟买, 印度 Bandra KUrla Complex(BKC)地铁站 Bandra Kurla Complex (BKC): 派利公司参建亚洲最大的地铁站
Terfener Innbrücke, Terfens, Austria: The Terfener Innbrücke, which measures roughly 235 m in length, is situated on the A12 motorway in the Inntal valley in Tyrol. (Photo: Günther Bayerl)
特尔芬斯, 奥地利 Terfener Innbrücke高速公路桥 在奥地利境内的A12 因河谷高速公路上,新建Terfener Innbrücke高速公路桥
For the construction of the three bridges WS 49, WS 52 and WS 54, PERI supplied an optimally coordinated formwork and scaffolding solution based on the VARIOKIT Incremental Launching Facility, VARIO GT 24 and TRIO Column Formwork and the PERI UP Scaffolding System.
Lubawka, 波兰 莱格尼察 卢巴夫卡 S3 高速公路 使用VARIOKIT VIL 顶推设备,确保每周完成一个浇筑段.
85米高、485米长的菲尔斯塔铁路桥项目几乎包含了桥梁建设中所有可以想到的挑战: 巨大的桥墩在顶部分离成Y字形结构,修长的造型、精细的上部结构,德国铁路公司对清水混凝土结构的高要求; 施工期间对桥梁的静态力学模型进行调整,导致了更紧张的工期。
Mühlhausen im Täle, 德国 菲尔斯塔-高速铁路桥 使用专业能力与系统化组件,为桥梁建设提供方案和技术支持
在慕尼黑Freimann新区,拜仁军营旧址处建造一座现代化教育基地,包括小学和高中的两座综合楼。
慕尼黑, 德国 慕尼黑,在军营旧址建造现代化教育中心 复杂的清水混凝土建筑项目
总面积约1.53万平方米的”桥梁结构“ 由70个10米高的V型支柱支撑。
法兰克福/美茵河畔, 德国 新建3号航站楼 项目定制的模板台车将工期缩短数月
The A26 project stands out on account of its five different tunnel cross-sections. In addition, the bends feature tight radii of 50 m to 750 m and the tunnel gradients vary, making it difficult to implement the new transport network.
林茨, 奥地利 A26多瑙河大桥引桥隧道 使用一台全液压履带式模板台车,浇筑不同截面造型的隧道
The ACS Core 400 System is versatile and can be used with VARIO GT 24 Girder Wall Formwork and MAXIMO Panel Formwork systems.
多伦多, 加拿大 加拿大,多伦多,Pinnacle One Yonge 使用派利爬架系统浇筑加拿大最高的住宅大厦
On the first section through the mountainous region of western Northern Macedonia, the new motorway crosses a total of 14 viaducts. On a length of approx. 10 km, around 4,000,000 m³ of earth had to be excavated and a total of 150,000 t of concrete and 15,000 t of reinforcement were subsequently processed.
Kičevo Podvis, 北马其顿 北马其顿, Kičevo Podvis 高速公路桥 使用悬臂吊篮系统为北马其顿高速公路桥提供项目定制方案。
12+660号高架桥是正在建设的基切沃(Kičevo)至奥赫里德 (Ohrida)高速公路项目的一部分,地势条件十分险峻。
北马其顿, 北马其顿 北马其顿,基切沃(Kičevo),12+660号高架桥 使用模块化系统满足复杂的地势要求提供方案
Construction of the housing complex Los Portones de Linares, Chile
利纳雷斯, 智利 Los Portones de Linares住宅群 两天完成一个施工流程,一体浇筑住宅
Construction of the Barwa Commercial Avenue, Doha, Qatar
多哈, 卡塔尔 巴瓦商业街 为8公里长的商业中心提供综合模板方案
Aspen Residence, George Town, Penang, Malaysia
乔治城, 马来西亚 阿斯彭公寓 该住宅、商业建筑顶层的片状墙体
Aerial view of the jobsite “ Stadtquartier am Hirschgarten“ MK 4 “Friends“, Munich
慕尼黑, 德国 MK4 “Friends” 鹿园城市住宅 深思熟虑的模板方案确保了快速的施工流程,并提高了施工安全性
A total of seven buildings form the new Maakri Quarter in the heart of Tallinn: a very striking multi-storey structure over 100 m high while surrounding historical buildings are being extensively renovated.
塔林, 爱沙尼亚 Maakri-Kvartal商业综合建筑 使用成熟的模板方案能够快速浇筑大厦。
Banco de la Ciudad de Buenos Aires - A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.
阿根廷, 布宜诺斯艾利斯 阿根廷,布宜诺斯艾利斯银行 合理浇筑曲面屋顶结构
Federal Chancellery Berlin - The challenging building form called for flexibly adaptable formwork and scaffolding systems.
柏林, 德国 联邦总理府 大型的脚手架、台模系统。
DaimlerChrysler Subsidiary Warsaw, Poland - Not far from Warsaw‘s city centre, the new headquarters building of the automotive group together with a Mercedes-Benz dealership containing showrooms and a service centre has been realized.
华沙, 波兰 戴姆勒克莱斯勒分公司 根据施工现场要求量身定制的高效支撑方案
Der neue Zollhof, Düsseldorf, Germany - The three spectacular buildings of the new Zollhof complex in Dusseldorf during different stages of construction.
杜塞尔多夫, 德国 新海关 建筑造型为三座相互交接并旋转的钢筋混凝土建筑物
Hotel Capella, Sentosa Island, Singapore - The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.
圣淘沙岛, 新加坡 嘉佩乐酒店 使用SKYDECK系统高效浇筑钢筋混凝土楼板
Hotel Marques de Riscal, Elciego, Spain - Designed by Frank O. Gehry, the building complex consists of several cuboids pushed into each other and an almost free-floating roof skin made of titanium.
埃尔谢戈, 西班牙 Marques de Riscal旅馆 完美适应独特的建筑造型
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
维也纳, 奥地利 维也纳北站住宅区 维也纳北站住宅区
Galileo Satellite Control Centre, Oberpfaffenhofen, Germany - The outside of the building resembles a medieval fortress. The facade is comprised of window openings as well as pre-determined regular tie points and horizontal pilaster strips.
Oberpfaffenhofen, 德国 伽利略卫星控制中心 精确、高效浇筑复杂的建筑造型,顶级质量的清水混凝土。
Potsdamer Platz, Berlin, Germany - The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin.
德国, 柏林 波茨坦广场 该项目是柏林市中心新开发项目的一部分,包括办公室、商业和住宅楼、火车站
South Health Campus, Calgary, Canada - The main building of the medical facility, situated south-west of Calgary, features two basement and eight upper levels each with around 20,000 m² of slab area.
Calgary, 加拿大 南方医疗中心 使用创新的台模方案,每周浇筑2800平方米的楼板
By combining CB Climbing Units with the MAXIMO Panel Formwork, the required high quality of the concrete surfaces was achieved while, at the same time, maintaining the tight construction schedule.
卡尔加里, 加拿大 六角办公大厦 MAXIMO内角模板系统快速拆模、简单实现顶升
As part of the extensive construction measures, a two-story passenger and ferry terminal has been realized on a total area of 25,000 m².
扎达尔, 克罗地亚 Gazenica港口客运码头 运营大厅 相互协调确定的模板、脚手架方案,加快了施工
Over 500 complete floors were completed with the UNO Housing Formwork using a monolithic construction method.
Prampram, 加纳 Saglemi住房项目 使用一体式浇筑方法进行施工,每3天完成一个循环
The new corporate headquarters of Sasol have 10 upper floors and 7 basement floors.
约翰内斯堡, 南非 萨索尔大厦 共计浇筑20万平方米楼板
Aerial view of the jobsite of the “villanova“ housing estate
维也纳 - 施韦夏特, 奥地利 „villanova“ 住宅区 使用MAXIMO和Skydeck提高了施工速度
Jeddah Gate “E3 – Abraj Al-Hilal 2“ during the shell construction
吉达, 沙特阿拉伯 吉达之门 „E3 – Abraj Al-Hilal 2“ 3天完成一个施工循环,减少了吊车的使用量
Three elevated high-rise structures for the new SPRM administrative centre. PERI supported the construction progress with an efficient climbing solution, complex shoring construction along with a comprehensive range of services.
马来西亚, 布城 马来西亚,SPRM 办公大厦 由3栋30层的建筑组成造型独特的建筑群
Situated next to the famous Vienna Prater amusement park, seven distinctive and up to 33 m high residential towers are currently being realized.
维也纳, 奥地利 „Viertel Zwei – Rondo“住宅公园, 大型公寓项目共计包含了200套公寓单元
Combined with a heating element, MAXIMO also offers the right solution for concreting at low temperatures. The heat supply provides an uninterrupted hydration process – as shown here in winter in Finland.
锡博, 芬兰 芬兰,Domino-Kortteli 住宅公寓 为冬季施工提供方案:确保在摄氏零下的温度环境下完成施工
以自然材料?为主要材料的三万两千平方米的居住空间,使该建筑群成为贝尔格莱德最具吸引力的居住区之一。
Novi Beograd, Србија, 塞尔维亚 ZepTerra-住宅、办公综合楼 , 按时交付设备是当务之急
ADAC Headquarters, Munich, Germany - For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
慕尼黑, 德国 ADAC德国总部 高效完整的解决方案、顶级的工程服务
21st Century Tower, Dubai, United Arab Emirates - The RCS climbing protection panel complete encloses the upper floors under construction and provides protection against wind and weather - and increases productivity.
迪拜, 阿拉伯联合酋长国 21世纪大厦 核心筒、楼板、外墙三天完成一个浇筑段
Barangaroo South, Sydney - The three ITS high-rise towers for the centre of the ambitious Barangaroo South project in the Sydney harbour area.
悉尼, 澳大利亚 Barangaroo South, ITS悉尼国际大厦 全面的安全性与不依赖吊车的爬架系统,加速了施工
 Skyline of Tel Aviv with a view of the construction site for the Alon Towers
特拉维夫, 以色列 以色列,特拉维夫,“BSR 中心 TLV“ Alon 大厦 根据施工条件确定经济的爬模系统
Construction of the 76 meters high office tower.
杜塞尔多夫, 德国 沃达丰大厦 使用为项目定制的模板方案和综合工程服务理念,缩短了工期
Dubai Frame, United Arab Emirates
迪拜, 阿拉伯联合酋长国 迪拜之窗 为巨型倾斜的画框式建筑提供爬模方案
Lo Storto, The Twisted One, the future administrative building of the Generali Insurance Group
米兰, 意大利 米兰忠利保险大厦 扎哈哈迪德设计的旋转塔楼。
Das zukünftig höchste Hochhaus Europas entsteht in Sankt Petersburg: Die Zentrale des Energiekonzerns Gazprom wird ganze 462 m hoch. Spektakuläre Multifunktionsgebäude, ein Amphitheater und großzügige Parks ergänzen den Komplex.
圣彼得堡, 俄罗斯 叶赫塔中心 为欧洲最高的大厦提供全套的模板、脚手架方案
Demolition of the centrally located Syngenta high-rise building was hardly noticed in the immediate surroundings.
巴塞尔, 瑞士 拆除Syngenta-大厦 在RCS防护屏内拆除大厦,几乎不被察觉的施工过程
When finished, the 77-storey high-rise building will have a total height of 324.50 m.
吉隆坡, 马来西亚 全季酒店 派利公司全套的项目服务确保了豪华酒店提前完成
During the summer months, the concrete shaft at the top of the tower and between the platforms and the bottom side of the lower platform were partly refurbished.
慕尼黑, 德国 奥林匹亚电视塔 在高空完成作业,对地标建筑部分翻修
Absolute World, Missisauga, Canada - One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
密西沙加, 加拿大 梦露大厦 北美洲的旋转世界: 一个爬架系统 – 两种不同应用。
Al Hamra Tower, Kuwait City, Kuwait - Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
科威特城, 科威特 Al Hamra 大厦 Al Hamra大厦与派利爬模优雅地向天空旋转
Avala TV Tower, Belgrade, Serbia - The perfectly adapted shoring and working scaffold optimally supplemented the cost-effective formwork solution.
塞尔维亚, 贝尔格莱德 阿瓦拉电视塔 新地标性建筑
Cuatro Torres Business Area, Madrid, Spain - For the very wide range of requirements, PERI provided the most cost-effective solution with the ACS self-climbing formwork.
Madrid, 西班牙 Cuatro Torres 商业区 ACS自动爬架系统能够一周内完成一个浇筑段,并满足所有施工要求
European Court of Justice, Luxembourg - The RCS climbing protection panel completely enclosed the slab edges of the upper floors under construction.
卢森堡, 卢森堡 欧洲法院 使用爬模与可爬升的防护屏,每周完成一层结构的施工
Evolution Tower, Moscow, Russia - Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
莫斯科, 俄罗斯 进化大厦 每周完成一个旋转的楼板结构
Hotel Mélia, La Défense, Paris, France - For the construction of the Hotel Meliá in the "La Défense" office district, PERI developed a comprehensive climbing formwork solution. This serves not only as an enclosure, which ensures the safety of the construction teams at all times, but also it supports the precast parapets during erection.
法国, 巴黎 美利亚酒店 可爬升的防护屏与脚手架系统解决方案
Il Bosco Verticale, Milan, Italy - Massive, 28 cm thick reinforced concrete balconies cantilever outwards for 3.35 m in an irregular fashion on all four sides of the building.
米兰, 意大利 垂直森林 在位于米兰的垂直森林项目的施工过程中,施工团队能够在高度方向上每周完成2米的施工
For constructing the 134 m high residential building, safety was a top priority. The PERI RCS P Climbing Protection Panel served as an enclosure as well as anti-fall protection. The gap-free enclosure of the skeleton structure´s floors protected the construction team also at great heights against strong winds and the weather.
赫尔辛基, 芬兰 Majakka 大厦, 芬兰最高建筑-冲破云霄的Majakka大厦
ISET Tower, Yekaterinburg, Russia - The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
叶卡捷琳堡, 俄罗斯 伊塞特大厦 项目定制的爬架方案,灵活适应建筑造型
JKG Tower, Jalan Raja Laut, Kuala Lumpur - A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
Kuala Lumpur, 马来西亚 Jalan Raja Laut, JKG 大厦 安全的施工环境加速了施工进程
Marina Bay Sands, Singapore - The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
新加坡, 新加坡 滨海湾金沙酒店 ACS自动爬架系统与SKYTABLE台模组合使用,最大限度地减少了吊车使用量
Porta Nuova Garibaldi, Milan, Italy - Each of the two towers has three reinforced concrete cores which were constructed with help of two PERI ACS self-climbing variants.
米兰, 意大利 加里波第新门 结合使用派利多种自动爬架系统
Prosta Tower, Warsaw, Poland - The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
华沙, 波兰 Prosta 大厦 钢筋混凝土的菱形网格结构,承受该办公楼的荷载
RONDO 1, Warsaw, Poland - The PERI CPP climbing protection panel reliably encloses the upper floors under construction.
华沙, 波兰 RONDO 1 合理的模板方案确保了安全、快速的施工过程
Torre Agbar, Barcelona, Spain - The cylindrical core and facade walls of this 142 m high office building were constructed with PERI ACS self-climbing technology.
巴塞罗那, 西班牙 Torre Agbar 大厦 使用ACS系统,不依赖吊车快速、安全地浇筑核心筒与立面结构
Las Torres de Hércules, Los Barrios, Spain - Over the entire height, oversized letters into the concrete facade symbolize the inscription "Non plus ultra".
洛斯巴里奥斯, 西班牙 赫拉克勒斯塔 ACS爬架单元-环绕圆型的办公楼建筑。
Trump International Hotel & Tower, Chicago, USA - With a height of 415 m, the Trump International Hotel and Tower on the Chicago River is a very impressive skyscraper.
芝加哥, 美国 特朗普国际酒店 & 大厦 使用ACS 与RCS系统,每周完成一层结构的施工
Trump World Tower III, New York, USA - With a height of 258 m and its luxurious furnishings, the Trump World Tower completely re-defined the New York skyline.
纽约, 美国 特朗普国际大厦III 两天完成一层的施工
Turning Torso, Malmö, Sweden - The Turning Torso structure turns at an angle of 90° as it climbs upwards over nine cubes – each cube consists of five floors.
马尔默, 瑞典 Turning Torso 来自雕塑的灵感,使用ACS自动爬架系统施工。
Warsaw Spire - With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.
华沙, 波兰 华沙顶峰大厦 凭借顶级的爬架技术,快速、安全地完成施工
The upper floors of the “BraWoPark Business Centers II“ in Braunschweig, where the PERI RCS climbing protection panel is used for advertising purposes on the two topmost floors.
布伦瑞克, 德国 BraWoPark II 商业中心 SKYDECK楼板模板系统与RCS可爬升防护屏的理想组合应用
The Al Habtoor City Towers are three high-rise buildings which are growing up to a height of 300 meters at the same time.
迪拜, 阿拉伯联合酋长国 Al Habtoor城市大厦 3座大厦以五天为一个施工周期,完成浇筑
The design of modern architecture confronts construction with very sophisticated demands.
布宜诺斯艾利斯, 阿根廷 阿根廷,Torre Banco Macro 顶部造型优美的银行大厦
Henninger Turm, Frankfurt am Main
法兰克福, 德国 新建亨宁格大厦 提供顶级的项目服务
Auditorio de Tenerife, Tenerife, Spain - The Auditorio de Tenerife is used as a concert hall and is an example of the almost unlimited possibilities provided by concrete construction. The formwork technology required for such a structure presented a special challenge which our engineers solved in a rational and safe manner.
圣克鲁斯德特内里费, 西班牙 特内里费礼堂 用定制的ACS结构,浇筑100米的悬挑翅膀结构.
Hradec Králové Library, Czech Republic - With an X-shaped floor plan, the architectural concept of this building created a new highlight in the urban development of the city of Hradec Králové. Originally, all external surfaces should have received an orange-painted facade. This concept was completely rejected due to the high-quality concrete surface finish.
克尼格雷茨, 捷克共和国 克尼格雷茨图书馆 使用VARIO GT 24 墙模系统施工,获得出色的混凝土浇筑结果
Casa da Música, Porto, Portugal - Built to coincide with “Porto 2001 – European Culture Capital”, the concert hall is pictured here after structural work had been completed.
Porto, 葡萄牙 音乐之家 浇筑倾斜、高大的清水混凝土墙体。
Centre Pompidou, Metz, France - The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.
Metz, 法国 乔治·蓬皮杜国家艺术文化中心 使用PERI UP系统为造型奇特的屋顶提供脚手架方案
Edificio Ágora, Valencia, Spain - A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
瓦伦西亚, 西班牙 Edificio Ágora 为美妙的建筑造型提供灵活的脚手架系统
Catholic Church Centre, Cologne-Blumenberg, Germany - 6 m long units with frames comprised of U 120 steel walers were positioned in pairs after the supporting scaffold, consisting of ST 100 stacking towers, had been adjusted.
科隆, 德国 天主教教会中心 别具一格造型的清水混凝土教堂建筑
MAXXI - Museo nazionale delle arti del XXI secolo, Rome, Italy - This extraordinary structure is characterized by twisting reinforced concrete walls which reach heights of up to 14 m.
罗马, 意大利 国立二十一世纪艺术博物馆 14米高的弧形墙、顶级质量的清水混凝土墙面。
Langen Foundation, Neuss-Hombroich, Germany - The glass veranda area is used to exhibit Japanese works of art from the last millennium.
诺伊斯,霍姆布洛伊, 德国 郎根基金会展厅 由混凝土和玻璃组成的一件建筑艺术品。
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
Michniów, 波兰 Michniów 纪念馆 使用系统模板完成复杂建筑项目的施工
Mercedes-Benz Museum, Stuttgart, Germany - The execution of this very impressive project required unique engineering and assembly implementation on the construction site.
斯图加特, 德国 梅赛德斯 - 奔驰博物馆 顶级模板技术的3D模块。
Musée Würth, Erstein, France - With the flexible VARIO GT 24 wall formwork system, the requirements regarding the formlining joint arrangement as well as the requested execution and positioning of the tie points could easily be fulfilled.
Erstein, 法国 伍尔特博物馆 14米高的清水混凝土墙体
Museum of Tomorrow, Rio de Janeiro - For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
里约热内卢, 巴西 未来博物馆 塑造未来
National stadium Kazimierz Górski, Warsaw, Poland - The complex construction project with highest quality requirements demanded an experienced construction site team as well as on-site support through PERI engineers.
华沙, 波兰 Kazimierz Górski-国家体育场 为2012年欧洲足球锦标赛场地提供模板和脚手架方案
Parco della Musica e della Cultura, Florence, Italy - The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.
佛罗伦萨, 意大利 Parco della Musica e della Cultura音乐文化公园 提供模板、脚手架一条龙式服务,保证了顺利的施工过程
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
Hallandale Beach, 美国 湾流公园飞马雕塑 超大型青铜铸件: 在PERI UP脚手架上生产的3D雕塑
St. Canisius Church, Berlin, Germany - The modern reinforced concrete design is characterized by exactly defined requirements placed on the visible concrete surfaces.
柏林, 德国 St. Canisius教堂 平整的模板接缝和作为设计元素的拉杆孔布局
Restaurante Florante Submarino, Valencia, Spain - With 77 t of PERI UP Rosett materials, the building´s design could be accurately realized as a three-dimensional spatial load-bearing structure.
瓦伦西亚, 西班牙 Florante Submarino餐厅 别具一格的建筑风格、造型卓越的屋顶结构
Sports arena Lora, Split, Croatia - The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.
斯普利特, 克罗地亚 克罗地亚,Lora体育场 承重支架和安装平台能够支撑高达180吨的屋顶重量
Heavy athletics stadium, Athens, Greece - HD 200 heavy-duty props combined with the MULTIPROP system formed a 21.00 m high shoring tower for load transfers of 500 kN.
雅典, 希腊 重竞技体育场 奥运会场馆建设
St. Martins Therme & Lodge, Frauenkirchen, Austria - With formwork and scaffolding systems perfectly matched each structural component, the concrete frame could be completely finished in only 9 months.
弗劳恩基兴, 奥地利 圣马丁温泉旅馆 以创纪录的速度浇筑
Temple of Divine Providence, Warsaw, Poland - With the help of the PERI UP Rosett modular scaffold system, 24-metre high shoring was erected at the main entrance of the temple. Even at large heights, up to 40 kN per leg could be safely and reliably transferred.
华沙 , 波兰 天佑国家神殿 使用系统组件满足复杂要求
UTEC University Campus, Lima, Peru - With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
利马, 秘鲁 UTEC大学校园 在紧张的工期内完成看台式的校园建筑
Lascaux IV - Centre International d’Art Pariétal (CIAP): Overall view of the museum complex. Through the TRIO panel formwork, the high requirements on the concrete surfaces have been fully met.
蒙蒂尼亚克, 法国 拉斯科 IV - 国际中心 d’Art Pariétal 使用派利施工设备,重现旧石器时代洞穴旧址
Overview of the construction site - PERI Project - "Humboldt Forum" City Palace, Berlin
德国, 柏林 德国,柏林洪堡城市宫殿博物馆 为柏林城市宫殿提供综合的模板、脚手架方案
Earthquake-proof shoring solution for the Stavros Niarchos Foundation Cultural Center building in Athens. Designed by the Architect Renzo Piano.
希腊, 雅典 斯塔夫罗斯尼亚尔霍斯基金文化中心 为雅典的新地标建筑搭建抗震脚手架
Aquatics Centre, London
伦敦, 英国 水上运动中心 独特的造型设计、顶级质量的清水混凝土。
Neuschwanstein Castle is one of Germany's most famous sights. Every year around 1.5 million tourists from all over the world visit the cultural monument near Füssen.
富森, 德国 新天鹅堡的修复 考虑全面,可在冬天加热的方案。
Bosjes Chapel (Photo: Steyn Studio)
沃尔斯利, 南非 博斯杰斯教堂 为造型设计复杂的教堂屋顶提供定制的模板方案
On two artificial islands at both exits of the HZMB tunnel, striking architectural concrete structures are currently being built. On the right of the picture, the exit at the west end of the tunnel can be seen. (Graphic: © China Communications Construction Company Ltd. CCCC)
香港, 中国 香港-珠海-澳门 跨海大桥 (HZMB) |东、西人工岛运营建筑 派利公司专业的项目服务确保了顶级清水混凝土工程圆满竣工
VitraHaus, Weil am Rhein, Germany - For the VitraHaus, twelve reinforced concrete bodies with massive gable roofs were stacked up to form a 20 m high building complex.
莱茵河畔魏尔, 德国 维特拉大厦 施工标准高、工期短
The new headquarters of the environmental company Bee'ah is currently being realized according to the plans of the famous architect Zaha Hadid. The design of the futuristic building with its complex structure is based on the shape of a sand dune. (Source: www.zaha-hadid.com)
沙迦, 阿拉伯联合酋长国 Bee'ah总部 扎哈哈迪德将建筑融合在阿联酋东部的沙漠中
For the fabrication of the massive reinforced concrete slab below the pitch, the PERI engineers support the MULTIFLEX girder slab formwork solution with almost 8-meter high PERI UP shoring towers.
莫斯科, 俄罗斯 VTB竞技体育场 为不同的施工任务提供灵活的系统解决方案
The Italian Expo pavilion has a very sophisticated architectural design and had to be built within an extremely tight time frame.
米兰, 意大利 2015年意大利世博会场馆 由TRIO系统组成的模块化特殊模板
Suspended PERI UP Working Platforms ensured the safe installation of a spectacular stadium roof in Singapore.
新加坡, 新加披 新加坡国家体育场 为安装屋顶提供安全的悬挂式作业平台
Bridge over the Dunajec, Tarnow, Poland - With some supplementary system components, the VARIOKIT engineering construction kit can also be used for the balanced cantilever construction method.
Tarnow, 波兰 杜纳耶茨河大桥 使用VARIOKIT工程套件悬臂施工桥梁
Motorway Bridge D1, Považská Bystrica, Slovakia - The constantly-changing cross-section of the superstructure placed great demands on the VARIOKIT system equipment.
Považská Bystrica, 斯洛伐克 D1高速公路桥 使用工程套件经济地搭建脚手架和立模
德拉瓦高速公路桥 - VARIOKIT 边梁模板车用于浇筑该桥面的外边梁,水平方向荷载由摩擦力完全抵消,不需要锚固
奥西耶克, 克罗地亚 克罗地亚,德拉瓦-奥西耶克大桥 为桥塔和桥梁上部结构提供模板方案
Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.
Zehun, 捷克共和国 Zehun生态桥 短时间内提供模板、脚手架材料,施工材料能够完美调整
Formwork solution with system components of VARIOKIT Engineering Construction Kit
挪威, Sør-Fron (Oppland) 哈波布鲁大桥 派利公司提供的悬臂式施工方案,减少了作业量,加速了施工
West tunnel of the former Elbe tunnel, which pedestrians continued to use, while the other tunnel was being repaired.
德国, Hamburg 老易北河隧道 100年以来,享受文物保护的St. Pauli老易北河隧道通向圣保利码头。
PERI brace frame structure to transfer the loads during single-sided concreting with ties of the DW 26 system, at the jobsite for the Audi tunnel in Ingolstadt.
Ingolstadt, 德国 奥迪隧道 在高气压下使用盖挖法完成城内隧道的施工。
Msheireb Metro Station, Doha
多哈, 卡塔尔 卡塔尔,Msheireb地铁站 40米深的中心城市建筑工地
Infrastructure buildings, Pilbara region, Australia
Pilbara, 澳大利亚 皮尔巴拉基础设施建筑 为大型基建项目提供各种不同的项目服务
Assembly of prefabricated elements
图恩, 瑞士 Schlossberg地下停车场 为图恩市中心建造一个可容纳300辆车的停车场
VARIOKIT heavy-duty shoring towers and truss girders are used as load-bearing shoring for the boundary segments of a 412-m long motorway bridge.
Paradeisia-Tsakona, 希腊 T4高速公路桥 提供为项目定制的系统化承重方案
Designed by Zaha Hadid, the new station – a construction consisting of concrete, glass and steel in the form of a bridge – is characterized by numerous curved shapes. Traffic flows from travelers inspired the architect to create this extraordinary shape.
那不勒斯 Afragola, 意大利 “南门”火车站 派利为意大利“南门”火车站提供整套工程解决方案。
VARIOKIT tunnel formwork carriage used during the construction of the U4 subway tunnel in Hamburg
汉堡, 德国 U4线地铁隧道 汉堡市最长的施工现场:从港口城市至易北河大桥,每周完成一个浇筑段
The slab formwork carriages used are very modular in their design; the great flexibility of the VARIOKIT standard components facilitate simple adjustments to suit project-specific conditions. The relatively low weight of the VARIOKIT solutions is an additional benefit of the Engineering Construction Kit.
瑞典, 哥德堡 玛丽霍姆斯隧道 连接了约塔河两岸的沉管隧道
The refurbished Williams Bridge is an important road link between the northern and southern districts of Rotterdam. Its unrestricted and safe use was also to be ensured during the scaffolding operations and renovation work.
鹿特丹, 荷兰 威廉姆斯大桥 派利组合产品系统,为高难度的桥塔提供脚手架方案
Viaduct Krakow-Płaszow Railway Junction - Customized solution through the flexible and modular adaptability of the system.
波兰, 克拉科夫 Plaszow铁路枢纽的高架桥 使用VARIOKIT工程套件为提供灵活的悬臂施工方案
Oparno Motorway Bridge, Czech Republic - The 258 m long and 50 m high arched bridge crosses the Opamo Valley in the Bohemian Forest.
Oparno, 捷克共和国 Oparno高速公路桥 为拱桥提供全套工程解决方案
Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.
Vila Real, 葡萄牙 横跨Rio Sordo的高速公路桥 使用系统组件施工:VARIOKIT高强塔架作为承重支架
Trmice Motorway Bridge, Aussig, Czech Republic - For the 1,083 m long Trmice motorway bridge near Aussig in the Czech Republic, 59 piers were cost-effectively formed using PERI formwork.
Aussig, 捷克共和国 Trmice高速公路桥 使用系统组件浇筑27米高的桥塔
Térénez Bridge, Crozon, France - Using a combination of ACS self climbing technology and VARIO GT 24 girder wall formwork, a crane-independent and safe solution was developed.
克罗宗, 法国 Térénez大桥 为不同的桥塔造型提供ACS自动爬架方案
Tošanovice-Žukov Bridge, Ostrava, Czech Republic - The VARIOKIT steel composite carriage consisted of three main components: the formwork units, cross frames and the two longitudinal trusses.
俄斯特拉发, 捷克共和国 Tošanovice-Žukov大桥 为捷克共和国境内最长的劲性混凝土桥梁提供VARIOKIT劲性混凝土模板台车
Chachenka Motorway Bridge, Moscow, Russia - The 22.25 m wide superstructure sections were constructed with section lengths ranging from 3.40 m to 4.10 m in regular 10-day cycles.
莫斯科, 俄罗斯 俄罗斯,Chachenka大桥 使用VARIOKIT悬臂吊篮系统,我们能够按计划完成施工
The expert engineers of PERI Israel ideally matched the superstructure formwork and the shoring for the crossing of a highway over a railroad line.
Ga'ash/Shefayim, 以色列 阿亚隆高速公路桥 模块化的桥梁施工方案、材料转运耗时少
The PERI bridge formwork concept was based on rentable modular construction systems with standardized components.
Čačak, 塞尔维亚 Brdjani 高速公路桥 使用系统组件组成不同的模块化脚手架
A tunnel formwork system solution based on VARIOKIT makes the Tauern motorway disappear in an enclosure structure within a short construction time for a length of 1,545 meters.
Zederhaus, 奥地利 奥地利,A10 高速公路隧道段 4天一个浇筑段,完成1.5千米长隧道的施工
The fabrication of the high side and center walls as well as the breakwaters for two transitional structures is carried out with mobile PERI portal formwork carriages – with a fast cycle sequence and in highest quality.
香港, 中国 香港-珠海-澳门 跨海大桥 (HZMB) | 敞开段工程 使用模板台车浇筑清水混凝土质量的隧道敞开段
英国默西河盖特威大桥,连接朗科恩与威德尼斯
从朗科恩到威德尼斯, 英国 默西河盖特威大桥 派利公司为默西盖河特威大桥提供施工方案
Citytunnel Malmö, Sweden - The southern entrance area was constructed using the cut-and-cover method for a length of around 1.5 km.
Malmö, 瑞典 马尔默城市隧道 模板台车与可租赁系统组件组成经济的施工方案。
The 3rd Bosphorus Bridge has the highest concrete bridge piers in the world, and will eventually connect the European and Asian continents after its completion in 2015.
伊斯坦布尔, 土耳其 博斯普鲁斯海峡第三大桥 使用ACS自动爬架系统浇筑世界上最高的混凝土桥塔.
BBI Airport, Berlin Brandenburg, Germany - Only when seen from an aerial perspective is the scale of the construction site really apparent: the area is the size of around 2,000 football pitches.
德国, 柏林 柏林勃兰登堡州机场 一年内完成航站楼的主体施工
Toulouse-Blagnac Airport, France - The semi-circular positioned reinforced concrete columns were concreted in one pour over the entire height of 11.75 m.
图卢兹, 法国 布拉尼亚克机场 三角形造型条,规则的拉杆布局孔。
Golden Ears Bridge, Vancouver, Canada - The almost one kilometre long cable-stayed bridge over the Fraser River is the core element of the 13 kilometre long highway project.
温哥华, 加拿大 金穗大桥 四个桥塔的施工过程不依赖吊车,每周完成一个施工循环
Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.
拉纳耶, 比利时 拉纳耶水闸桥 使用VARIOKIT系统浇筑水闸桥
Lekki Ikoyi Bridge, Lagos, Nigeria - The Lekki Ikoyi Bridge in Lagos is the first cable-stay bridge in Nigeria.
尼日利亚, 拉格斯 Lekki-Ikoyi 大桥 合理、可靠结合两种爬架系统进行施工
Lötschberg Tunnel, Mitholz, Switzerland - Tunnel formwork carriage for a cross-section width of 15.74 m and 12.54 m high. At first, the tunnel side walls were shuttered and concreted.
Mitholz, 瑞士 勒奇山地下隧道 用于浇筑侧壁和顶板的模板台车。
Marchlehner Gallery, Sölden, Austria - The VARIOKIT tunnel formwork solution accelerated construction of the 228 m long Marchlehner gallery situated at a height of 1,800 m above sea level. The competent planning process took into account al possible project requirements which ensured on-schedule completion before the onset of winter.
Sölden, 奥地利 marchlehner廊道 使用项目定制的模板台车,按期完成施工。
Mega Bridge, Industrial Ring Road, Bangkok, Thailand - The four pylons of spectacular Mega Bridge in Bangkok rise 173 m into the sky. For the realization, the ACS climbing system ensured rapid construction process.
曼谷, 泰国 普密蓬大桥 4个173米高的桥塔,使用派利ACS系统每周完成一个施工段
Midfield Terminal Building, Abu Dhabi - The Midfield Terminal Complex is the ultimate in construction sites.
阿拉伯联合酋长国, 阿布扎比 MTB机场航站楼 共累计使用超过6000个台模
Metro extension, Algiers - The Algerian metro station "Place des Martyrs" is 144 m long and features record-breaking dimensions with its 23 m width and 14.80 m height.
Algier, 阿尔及利亚 „Place des Martyrs“ 地铁站 „Place des Martyrs“ 地铁站施工中所使用模板台车的尺寸,可能是世界上最大的。
Hongkong-Zhuhai-Macao Bridge (HZMB), China - The 180 m long tunnel elements are cast in eight individual segments each 22.50 m long – monolithic, without ties and in compliance with strict dimensional tolerances.
香港, 中国 香港-珠海-澳门-跨海大桥 使用液压顶推-模板机浇筑出世界上最长的沉管隧道
Mur Bridge Frohnleiten - For the construction of the Mur Bridge near Frohnleiten, the new VARIOKIT heavy-duty truss from PERI has set new standards in shoring operations.
弗罗恩莱滕, 奥地利 S35穆尔大桥 桁架结构跨度大、承载能力强、自重轻
Øresund Link, Denmark–Sweden - One of the two production lines with the formwork assemblies reaching a total weight of 1,150 t. Here the internal formwork has been retracted into the reinforcement cage.
哥本哈根, 丹麦 厄勒海峡-通道 提供当时最大的全截面浇筑的隧道模板。
Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
慕尼黑, 德国 慕尼黑机场卫星航站楼 为施工单位和脚手架公司提供全套的工程服务
The Squaire, Frankfurt am Main, Germany - PERI UP scaffolding on the longitudinal sides of the building was designed according to the expected loads and carried the construction loads.
法兰克福, 德国 The Squaire办公大楼 SKYDECK楼板模板安装在可移动的特殊结构上
Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.
华沙, 波兰 Czerniakowska交通枢纽 顺利施工的同时,保证交通顺畅
Traffic junction Siekierkowska roadway, Warsaw, Poland - For the superstructure formwork as well as the shoring construction consisting of the MULTIPROP system and ST 100 stacking towers, only system components were used.
华沙, 波兰 波兰,Siekierkowska交通节点 钢筋混凝土上部结构模板-能够被快速转运,节约了成本
Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.
巴卢阿特, 墨西哥 巴鲁阿特大桥 使用派利产品安全、精确地浇筑拉丁美洲的最高桥梁
Tunnel bypass Flüelen, Switzerland - The special support und moving construction comprised of elements from the PERI tunnel waler system which adapted exactly to each cross-section. The complete formwork unit could be moved on rails from section to section using pulling equipment supplied by the contractors. Due to economic reasons, setting and stripping were done mechanically.
Flüelen, 瑞士 绕弗吕埃伦隧道 9天完成4个施工段。
Tunnel Jumeirah Palm Island, Dubai, United Arab Emirates - In 25 m long concreting steps and four cycle sequences, the tunnel bottom plate, two wall sections respectively and then the slab could be concreted one after the other.
迪拜, 阿拉伯联合酋长国 朱美拉-棕榈岛隧道 坚固、多功能的系统。
Tunnel Limerick, Ireland - Tunnel formwork carriage on the basis of the VARIOKIT civil engineering construction kit for the six additional concreting sections at the southern portal carried out parallel to the construction of the main tunnel elements.
Limerick, 爱尔兰 利默里克隧道 沉管隧道,6天浇筑一段。
Nordhavnsvej Tunnel - The formwork carriage has been designed so that trucks can pass through at any time without obstacles. Due to the cramped site conditions, an absolutely essential requirement for the execution.
哥本哈根, 丹麦 丹麦,Nordhavnsvej隧道 一条龙式项目定制的模板、脚手架方案。
Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.
索契, 俄罗斯 索契隧道 灵活、承载能力强的隧道模板车
Viaduc de Millau, France - In the area of the double piers, 14 complete ACS self-climbing units with telescopic working platforms were used.
法国, 米洛 米洛高架桥 世界上最高的桥墩,顶级质量的清水混凝土。
Waldschlösschenbrücke, Dresden, Germany - Two steel arches, each with a span of 148 m, carry the middle section of the Waldschloesschen Bridge 26 m above the Elbe.
德累斯顿, 德国 森林宫大桥 横跨易北河、造型优雅的拱桥
Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
阿布扎比, 阿拉伯联合酋长国 谢赫哈利法桥 倾斜的桥墩,使用系统组件浇筑巨型桥梁上部结构
两座新建全长166米的立交桥是造Novog Sada 至 Kelebije高速铁路线升级改造项目中的一部分。
Subotice, 塞尔维亚 塞尔维亚,Kelebija,NOVI SAD 铁路立交桥 现代化改造Novog Sada 至 Kelebije高速铁路线
贝尔格莱德环城高速公路是该地区最重要的交通路段之一,随着5 号(3.1 公里)、6 号
路段(9.6 公里)施工的完成,贝尔格莱德半环城高速公路项目也即将竣工,这将显著缓解首都
拥堵的交通路况。
Beograd, Србија , 塞尔维亚 贝尔格莱德环城高速公路 经济、高效的工程解决方案
使用VARIOKIT-VST高强塔架搭建8米高的塔架支撑,在塔架之间使用VARIOKIT-VRB桁架梁组装跨度28米的桁架结构。
Požarevac , 塞尔维亚 大摩拉瓦河桥梁工程 (沿多瑙河高速公路-第一标段) 使用派利多种系统为工程提供综合解决方案
Czajka Sewage Plant, Warsaw, Poland - In a construction time of only two years, a total of 120 individual structures were built on an area equivalent to 80 football pitches.
华沙, 波兰 Czajka 大型污水处理厂 工期短、安全性高
PERI project - water retaining structures - Foz Tua Dam, Vila Real – Alijó, Portugal
阿利若, 葡萄牙 图阿河水坝项目 为雄伟的大坝工程提供整套工程服务。
Formwork, scaffolding, engineering: PERI supported site operations with a project-specific formwork and scaffolding concept.
特里尔, 德国 摩泽尔水闸 使用大量的预制模板提供为项目定制的模板方案
Sandelermöns Waterworks, Jever, Germany, PERI project
Sandelermöns, 德国 Sandelermöns水库 使用RUNDFLEX Plus系统精确、高效浇筑桶形蓄水池
Canal bridge over the river Elbe, waterway junction Magdeburg, Germany - The 17 monumental piers of the foreland bridge are characterised by positioned tie points, dummy joints, clearly defined recesses and geometry resembling the shape of a ship´s bow. The contractor also used VARIO GT 24 wall formwork here and achieved excellent concrete surfaces.
马格德堡, 德国 马格德堡运河桥 高流量水道
Sewage plant As Samra, Jordan - With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.
萨姆拉, 约旦 莎姆拉污水处理厂 经济地浇筑墙体和顶板结构
Nile river barrage Naga Hammadi, Egypt - The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.
纳加哈马迪, 埃及 尼罗河纳加哈马迪大坝 快速的爬升过程,高质量地浇筑
Lock facilities, Panama Canal, Panama - More than 12 months after starting the development work on the Panama Canal, the dimensions and the massive structural elements are clearly visible.
巴拿马, 巴拿马 扩建巴拿马运河 派利系统在世纪工程中的应用
Gravity dam Barrage Koudiat Acerdoune, Algeria - The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.
Koudiat Acerdoune, 阿尔及利亚 Barrage Koudiat Acerdoune 大坝 为庞大的坝墙提供灵活的工程方案
The climbing formwork solution, which is based on system construction elements and 3D-formwork units, is individually adapted by the PERI experts to the building geometry and the single-sided load transfer.
Port Louis, 毛里求斯 Bagatelle 大型水坝 3D-爬架系统,项目定制方案。
The fabrication of the subterranean machine cavern as well as the two intake structures require a sophisticated formwork plan as well as expert jobsite support.
马蒂尼, 瑞士 ,Nant de Drance 抽水蓄能电站 为采用矿山法施工的大型工地提供模块化的模板方案
PERI Belarus works out a comprehensive formwork and shoring concept for every construction status.
波洛茨克, 白俄罗斯 道加瓦河水电站 提供顶级的施工设备与细节丰富的施工方案
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.
埃尔丁, 德国 空客A350 XWB实验台 模块化、可结合、适应性强:使用PERI UP搭建起飞测试平台。
LGS Weather Protection Roof from PERI, the lattice girder system for weather protection, rain protection, snow protection, hail protection.
德国, Gerolzhofen 生产车间的防护顶棚 格罗尔茨霍芬 由系统组件组成的、项目定制的防护顶棚系统。
The first of a total of three sections will become operational in the autumn of 2017.
加拿大, 埃德蒙顿 雷德沃特项目 安全、高效的工业设施项目
Los Ramones II Pipeline, San Luis Potosi, Mexico
San Luis Potosi, 墨西哥 Los Ramones II 管道站 新建的天然气管道站点
The weather protection roof based on the PERI UP Flex LGS Lattice Girder System provided reliable protection against the effects of the weather. The roof segments could be pre-assembled on the ground and subsequently lifted into their final position using a mobile crane.
比特费尔德-沃尔夫, 德国 比特费尔德 - 沃尔芬化工园,桶形容器维护工程 系统脚手架方案为施工提供了高安全保障
Albian Sands, Fort McMurray, Canada - Through the planning and supply of formwork and scaffolding from one source, the MULTIFLEX slab formwork and PERI UP shoring could be perfectly matched.
麦克默里堡, 加拿大 油砂矿井 灵活地适应高负载
Refuse Derived Heating and Power Station, Spremberg, Germany - The VARIOKIT heavy-duty shoring towers with a height of 23.60 m can support loads of over 200 t in each case. The horizontal assembly of the approx. 10 m high tower sections makes the erection of the shoring easy and safe.
Spremberg, 德国 垃圾衍生燃料热电站 为巨型的发电站提供模板、脚手架方案
Grain Silo near Parma, Italy - Cost-effective PERI climbing concept: with a complete platform level and halved on-site wall formwork requirements, fast and continuous working operations were achieved.
帕尔马, 意大利 帕尔马粮仓 两周一个施工循环,高质量完成施工
Power plant Belchatow, Poland - The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
Belchatow, 波兰 Belchatow电厂 经济、高效的发电厂
Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
埃姆斯哈文, 荷兰 埃姆斯哈文燃煤发电厂 安全标准要求高的工业建筑
Exhibition centre Bilbao, Spain - For the construction of the Bilbao Exhibition Centre, PERI engineers developed a practical movable falsework and formwork solution.
毕尔巴鄂, 西班牙 毕尔巴鄂会展中心 为非常规的施工方式提供定制的方案
Palm paper mill, King’s Lynn, Great Britain - Only 7 months after beginning the excavation and foundation work, the topping-out ceremony took place; 8 months later, production started in August 2009.
金斯林, 英国 帕尔姆造纸厂 灵活的模板、脚手架综合方案
Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.
Doboj, 波斯尼亚和黑塞哥维那 Stanari热电厂 派利公司高效的模板、脚手架方案
Cement plant Ivano-Frankowsk, Ukraine - For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution.
Ivano-Frankowsk, 乌克兰 Ivano-Frankowsk水泥厂 施工要求高,在工厂运营期间施工
Jobsite with scaffolds and crane at the building of the dedusting system of blast furnace 9 of ThyssenKrupp Steel Europe in Duisburg
杜伊斯堡, 德国 9号除尘高炉 在暂停使用的状态下,根据最新的技术标准,现代化整修高炉
The PERI shoring concept for the transfer of high loads was based on standardized construction kit systems: MULTIPROP, HD 200 and VARIOKIT. The required access technology is generated with the PERI UP modular scaffolding system.
科杰尼采, 波兰 科杰尼采电厂 组合使用不同的系统,为项目提供合理的承重方案
CACAK-TRBUSANI-隧道全长278米,是新建的E763高速公路上连接Prejina与Pakovraće12公里公路段中最具挑战的建筑结构。工程完工后,现有高速公路段出口处的拥堵现象将显著减少,在很大程度上缓解Čačak地区的交通压力。
Čačak, 塞尔维亚 塞尔维亚,CACAK-TRBUSANI隧道 使用标准组件,提供经济、高效的施工方案
Bridge renovation Ponte Rio Tua, Vila Real, Portugal - For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.
雷阿尔城, 葡萄牙 图阿河里约大桥修复项目 灵活的脚手架加速了桥梁的修复施工。
Unusual Scaffolding solution: Cantilevered instead of positioning. New engineered working scaffold solution.
卢森堡, 卢森堡 皇家酒店 组合应用不同系统,为酒店的翻新工程搭建悬挑结构
The refurbishment of the 185-m long Inntal Bridge is carried out with two PERI construction kit systems which complement each other – mostly without any negative impacts on road traffic.
Radfeld, 奥地利 翻修A12因塔尔高速公路桥 保证桥梁修复的施工过程中铁路顺畅
Up to 70,000 visitors flock daily to Australia's largest shopping centre which is now completely covered by a gigantic glass roof – the result of an expansion project. Work was carried out while the centre remained opened for daily business; the schedule for the entire construction project was extremely short. (Photo: David McArthur Parallax Photography)
墨尔本, 澳大利亚 Chadstone购物中心 使用PERI UP脚手架实现建筑设计上的亮点''Down Under''
Marie-Elisabeth-Lüders-Haus, Berlin
柏林, 德国 德国联邦议院的玛丽 .伊丽莎白. 吕德斯故居 为柏林联邦议院提供可移动的悬挂脚手架
The PERI UP scaffold level at a height of 5 m reliably separates the production line of the bottling plant from the construction work on the roof structure.
Vaihingen/Enz-Ensingen, 德国 Enz-Ensingen市,新建灌装机厂房屋顶 PERI UP 防护脚手架: 不间断生产的情况下现代化设备
Cristo Rei Monument, Lisbon, Portugal - Work could be safely carried out on the spacious and geometrically adapted working platforms of the PERI UP Rosett scaffold which was erected up to the head of the statue.
里斯本, 葡萄牙 大耶稣雕像 快速安全地搭建大耶稣雕像
Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
慕尼黑机场, 德国 慕尼黑机场顶板翻修 在机场运营期间完成屋顶的翻修
Karlskirche Church Vienna, Austria - The cantilevered working platform as seen from the visitors platform.
维也纳, 奥地利 维也纳查尔斯教堂 不影响游客参观,完成教堂圆顶的修复工作。
Maritime museum Tallinn, Estonia - A total of 8,500 m² of exhibition space is now available under the three domes.
塔林, 爱沙尼亚 塔林海洋博物馆 该引人入胜的博物馆包含具有历史性价值的钢筋混凝土穹顶结构
Museum of military history, Dresden, Germany - The almost 100 m long Libeskind-designed structure features a 30-metre high wedge tip made of glass and steel.
德国, 德累斯顿 德累斯顿军事历史博物馆 在历史遗迹中完成复杂的建筑施工
Puente de La Pepa, Bahia de Cádiz, Spain - Almost half of the 3.2 km long bridge construction crosses the Bay of Cadiz, with a 540 m span and 69 m vertical clearance between the two pylons.
Bahia de Cádiz, 西班牙 Puente de La Pepa大桥 连续变化的全圆角截面
Motorway bridge over the Rio Sordo, Vila Real, Portugal - The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.

详细了解派利公司如何为您的项目提供支持?

高效、经济、安全

联系我们