为游泳馆正面欢迎区施工时,不仅要求顶级的质量的清水混凝土,而且要保证极高的施工精度,确保后期可以顺利安装玻璃幕墙。<br/>

水上运动中心
英国, 伦敦

2012年夏季奥运会的水上项目比赛场地

地点
项目类别
大型公共建筑项目
客户介绍
总承包商: Balfour Beatty plc
分包商: A Morrisroe&Sons Ltd.,Borehamwood / London
建筑师: 扎哈哈迪德

项目实现

工地快照、项目记录

客户需求与派利工程解决方案

“With the eyes of the world on London in 2012, the quality and finish of the concrete in the Aquatics Centre had to be of Gold Medal standard. The walls around the pools, particularly the end walls, curved vertically and horizontally whilst changing thickness and needed to be fair faced on both sides. To create the fluid geometry concept intended by Zaha Hadid, the specification required shutters designed and built to millimetre accuracy in 3 dimensions. After using PERI products over many years, we knew this would be “The Job” for PERI. Working rigorously with the PERI engineers installing the 3D modelled formwork, we achieved the high quality architectural finish required.”
“With the eyes of the world on London in 2012, the quality and finish of the concrete in the Aquatics Centre had to be of Gold Medal standard. The walls around the pools, particularly the end walls, curved vertically and horizontally whilst changing thickness and needed to be fair faced on both sides. To create the fluid geometry concept intended by Zaha Hadid, the specification required shutters designed and built to millimetre accuracy in 3 dimensions. After using PERI products over many years, we knew this would be “The Job” for PERI. Working rigorously with the PERI engineers installing the 3D modelled formwork, we achieved the high quality architectural finish required.”
Tony Henry
项目经理
2012年,世界各地的目光都聚焦伦敦,因此水上运动中心的混凝土质量必须达到顶级标准。泳池周围的墙壁设计独特,特别是前端面的墙壁在所有侧面的都是弯曲的,并具有不同的厚度,墙体两面均要达到顶级清水混凝土等级。为了实现由扎哈-哈迪德设计的流线造型,3D建筑模板必须达到毫米级的精度。在使用派利产品多年后,我们相信派利能够完成这个挑战。通过与派利工程师紧密地合作,我们可以按要求组装3D模块,达到设计要求的混凝土浇筑质量。

相关产品系统

模板、脚手架、工程技术服务

高效、经济、安全